Polski English

REALIZED PROJECTS

In 2013:
The following services were provided for the AGAT S.A. Company:
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Repair of dike in BS Plebanka
- Execution of fencing-related works in Z6W Helenka and Z10W Leszno
- Repair of foundations of the second node’s output tray in Zawady
- Installation of the DN1000 sliding bolt in BM Gdansk
- Modernization of the protection system in the office located in Miszewo Strzałkowskie
- Montaż zasuwy DN1000 w BM Gdańsk

The following service was provided for the TECHNOMONTAŻ Sp. z o.o. Company:
- Safe pipe cutting in BP in Emilianowo

The following service was provided for the CKTiS S.A. Company:
- Corrosion removal from steel installations in Cracow-Olszanica


In 2012:
The following services were provided for the AGAT S.A. Company:
- Modernization of the JET-A1 fuel intake and distribution system in TP no. 81 in Cracow Olszanica
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Repair of oil storage tank in ST-4 Kleczew
- Repair of protective components of the pipeline section crossing the watercourse in Gorczenica
- Replacement of the DN600 sliding bolt in SZ Jasienica
- Shallowing of the optical fiber at the intersection with the Brzozów channel

The following services were provided for the OLPP Sp. z o.o. Company:
- Reconstruction of the loading interface separator in BP no. 22 in Małaszewiczw

The following service was provided for the PKN ORLEN S.A. Company:
- Repairing of the equalizer and the infrastructure of tanks no. 2-22 in TP in Mościska

The following service was provided for the IDS-BUD Sp. z o.o Company:
- Securing of the DN250 oil transmission pipeline during the construction of Auchan Mall in Łomianki

The following service was provided for the ORLEN Projekt S.A. Company:
- Implementation of coke separator in the Olefina II installation for the PKN Orlen S.A. Company

The following services were provided for the MERKOP MMK Sp. z o.o. Company:
- Repair of tank no. 8 in BP no. 9 in Wola Rzędzińska
- Repair of tank no. 9 in BP no. 9 in Wola Rzędzińska

The following services were provided for the CLIMBEX S.A. Company:
- Repair of mechanical storage tanks no. 14 and 18 in the branch of the company located in Adamowo
- Installation of spouts on tanks no. 13 and 14 in BM Gdansk

The following service was provided for the Polimex-Mostostal S.A. Company:
- Implementation of pipeline hook-ups in BP no.5 in Emilianowo

The following service was provided for the MICRONET Sp.z o.o. Company:
- Repair and legalization of tanks no. 13 and 14 in BM Gdansk


In 2011:
The following services were provided for the AGAT S.A. Company
- Lowering of the pipeline in BM 111 in Wroclaw
- Reconstruction of the pumping station and the slop tank system in BP Emilianów
- Expansion of MPS-1 and MPS-1 of the airport in Łask
- Creation of the comprehensive fire protection system, including directional pipelines for the EB1 and EB2 tanks in BM111 in Wroclaw
- Creation of the DN200 tank connecting pipeline in BM111 in Wroclaw
- Connection of the fire protection system to the foam distribution turrets in BM 111 in Wroclaw
- Creation of customized adapters for the ENRAF device in BM 111 in Wroclaw
- Creation of customized fire sprinkler system, being a part of the loading interface in BM 111 in Wroclaw

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Replacement of measuring posts in the city center section
- Pipeline R1 –R2 in Gdansk mending
- Oil gathering unit in ST-6 Łupowo mending
- Repair of horizontal perforations under the road in Mykanów, Konopiska
- Installation of measuring posts in the village of Miroslav
- Replacement of the pipeline in Trzepowo Nowe

The following services were provided for the OLPP Sp. z o.o. Company
- Execution of professional repairing works of the tank no. 11 in Wola Rzędzińska
- Attachment of spouts to tanks no. 1, 2, and 3 in Wola Rzędzińska
- Attachment of spouts to tanks no. 7, 10, 11, and 12 in Wola Rzędzińska

The following service was provided for the ORLEN OIL Company:
- Replacement of pipelines being parts of the Mek-Tol installation in the branch of the PKN Orlen S.A Company in Plock

The following service was provided for the SENSOR ACM Company:
- Modernization of 23 tanks in the OLPP office
The following service was provided for the TM-BUD S.C Company:
- Creation of customized system facilitating the installation of fire sprinklers; Installation executed in the military base in Cybowo

The following service was provided for the MERKOP MMK Sp. z o.o. Company:
- Remont 3 szt. zbiorników w OLPP w Woli Rzędzińskiej


In 2010:
The following services were provided for the AGAT S.A. Company:
- Modernization of the fire protection system in the OLPP no. 9 Fuel Depot in Wola Rzędzińska
- Modernization of 10 fuel tanks for the PKN Orlen SAbr /> - Modernization of excessive pressure protection systems of theoil pipelinesin BS Plebanka

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Shutdown of a section of the pipeline in Napachanie
- Renovation of the railway crossing in Mykanów
- Insulation of the SZ7W Plecewice and SZ6W Helenka valve houses
- Underground pipeline in Trzepowo Nowe mending
- Hydrant system in ST-3 Góry mending
- Liquidation of shallowing of the DN 500 oil pipeline in Polesie
- Insulation works on pipeline entrance and exit sections in ST-6 Łupowo

The following service was provided for the MICRONET Company”
- Renovation of the storage tank no. 9 in the OLPP in Wola Rędzińska


In 2009:
The following repairing works and modernizations were executed for the AGAT S.A. Company:
- The Furfural installation in Orlen Oil in Płock
- Expansion of the 111 warehouse section in Wroclaw

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Corrosion removal from the pipeline located in Sławoszewek
- Installation of the DN500 sliding bolt in ST-4 in Kleczew
- Connection of leakage prevention tanks in ST-2a in Orzechowo
- Removal of pipeline shallowings in Władysławów, Grabowa, Laski
- Replacement of a section of underground pipeline located between Góry and Kleczew
- Corrosion removal from R1-R2 pipeline in Gdansk


In 2008:
The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- replacement of the DN600 sliding bolts at the Bug-Narew section of the pipeline
- Replacement of the DN 500 pipeline in Morasko, Chwałkowie, Psary Polskie
- Repair of hazardous materials storage in w BS Miszewo Strzałkowskie
- Repair of the fire protection network in ST-4 Kleczew
- Removal of pipeline and optic fiber shallowings in Jamki, Rękoraj Dobra, Biskupia Wola, Kamieńsk
- Disassembly of wedges from the Rd0 switchboard, which were prior user to connect R1 and R2 pipelines in BM Gdansk
- Examination of the condition of underground pipeline connections in Krubin, Osmólsk, Osmolin, Czerniew, Niespusza

The following services were provided for the AGAT S.A. Company:
- Creation and preparation of the DN 300 pipeline for installation by utilization of the HDD drilling method. Drilling-related works were performed under the Vistula river, between the
Winduga and Kawka management points
- Installation of fuel storage system in the Air Base no. 32 in Łask


In 2007:
A comprehensive modernization of the warehouse section no. 82 of the PKN ORLEN branch in Żurawnica was executed. The procedure included the following:
- Installation of new standard and wide-format filling systems
- Installation of new loading interface
- Replacement of fire protection piping for the filling systems and the toluene storage tank
- Modernization of foam and water pumping station
- Creation of toluene pumping station and foam accumulation system
- Creation of discharge system
- Creation of trestle piping


Construction of fuel storage installation and creation of the MPS1-MPS2 transmission pipeline in the Air Base no.32 in Łask. The executed undertakings included:
- Creation of supplementary installation in the jet fuel filter chamber
- Assembly of emergency tank piping
- Installation of underground pipelines connecting consecutive facilities, as well as creation of the transmission pipeline

Modernization of the technological installation of the first node pumping station located in ST-4 Kleczew, owned by the PERN S.A. Company. The modernization was mainly oriented on construction of oil disposal manifold for removal of oil from discharge pumps

- Water removal from the fire protection installation of the V=2500 storage tank, located in the warehouse section of the PKN ORLEN S.A. branch no. 31 in Gdansk


In 2006:
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street
- Examination of the condition of underground pipeline connections in Podolin, Karpin, Majków, Twardosławice
- Repair of perimeter fire protection network in ST-1 Adamowo

Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street
- Examination of the DN 800 pipeline for the Lotos Gdansk Company

Works performed for the Community Office in Suchy Las, 62-002 Suchy Las, Szkolna 13 Street
- Creation of the oil pipeline casings
DN700 and DN1000

Works performed for the HERO Poland Sp. z o.o., 09-401 Płock, Ciechomicka 15 Street
- Assembly of jam production system
- Assembly of juice production line


In 2005:
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street
- Examination of the condition of underground pipeline connections in Koluszki
- Repair of leakage prevention tanks in Łupowo, Kleczew, Tarnowo Podgórne
- Examination of the condition of underground pipeline connections in Łojki, Szarlejka, Lgota, Wola Hankowska
- Repair of industrial sewage system in Kleczew
- Modernization of oil cooling installation in the first node pumping stations in Kleczew, Tarnowo Podgórne, Łupowo, Góry

Works performed for the NAFTOREMONT Sp. z o.o. Company, 09-411 Płock, Zglenickiego 46 Street
- Disassembly of an unused DN600 pipeline in Sokołów Podlaski


In 2004:
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street
- Examination of the condition of underground pipeline connections in Łąck, Lubień Kujawski, Chotel
- Replacement of underground pipeline in Sompolno
- Removal of pipeline shallowings in Budy Kozickie

Works performed for the NAFTOREMONT Sp. z o.o. Company, 09-411 Płock, Zglenickiego 46 Street
- Construction of the gas station in BS Plebanka


In 2003:
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street
- Examination of the condition of underground pipeline connections in Sokołów Podlaski and Siemiatczyce
- Repair of the PG3/ST 2Apumping unit piping in Orzechowo
- Repair of air disposal piping in BS Plebanka
- Repair of the pipeline located above the Warta-Gopło channel


 

 


Artneo   About us : Our offer : Technical capabilities : Realized projects : Organizational scheme : Certificates : Contact us